No. Building Client Project description Work completion time
1. Establishment of toll user points (CUT) in the management of DARS d.d. DARS d.d. Construction of NN and OK connection at 6 locations in Slovenia, including construction works and installation of containers. dec.17
2. PETROL BS PODLEHNIK EAST – Electrical works Petrol Implementation of electrical installations and supply of equipment: switching blocks, lighting, grounding, lightning protection and connection of technological equipment for the construction of a new petrol service station. nov.17
3. Traffic arrangements for the establishment of the electronic toll system with free flowing traffic DARS d.d. Design, creation, construction and installation of 125 portals on motorways throughout the Republic of Slovenia for the purpose of electronic toll charging, including power supply and optical network. nov.17
4. Relocation of the TC network in the implementation of PROMENADA project in Velenje HTZ Velenje I.P.d.o.o. Moving and protection of all TC lines jul.17
5. Construction of the TC network in the construction of a new connecting road from Tržaška cesta to C. na Vrhovce (Podvoz Vič) Javna razsvetljava, d.d. Moving and protection of all TC lines mar.17
6. PETROL BS Domžale – Electrical works Petrol d.d. Implementation of electrical installations and supply of equipment: switching blocks, lighting, grounding, lightning protection and connection of technological equipment for the construction of a new petrol service station. dec.16
7. Supply and installation of LED outdoor lighting at OMV service stations OMV At all OMV service stations, we replaced all external lamps with new LED technology. At the same time, the rehabilitation of candelabra and installations was carried out by conducting electrical measurements. sep.16
8. Construction of the network and arrangement of crossroads of roads with railways on the section Pragersko – Hodoš as part of the electrification and reconstruction of the Pragersko – Hodoš railway line (segments E and F) SGP Pomgrad d.d. Moving and protecting all TC lines and the OŠO network due to electrification of the track nov.15
9. Upgrading existing base stations with LTE system Ericsson, d.o.o. Replacing antenna and core devices for upgrading the system from 3G to 4G nov.15
10. Replacement of control cabinets for Diesel Electro Aggregates at the facilities of TELEKOM – Facilities: FL Celje, FL Maribor Telekom Slovenije, d.d. Replacement of control cabinets is carried out on old Diesel Electric Aggregates, which improved the reliability of the DEA operation and performed remote monitoring of operating parameters. okt.15
11. Relocation and protection of the TC network due to the renovation of the Slovenska cesta from Gosposvetska cesta to Šubičeva ulica KPL, d.d. Relocation and protection of all TC lines at this location maj.15
12. Network maintenance in settlements Remscheid, Siegen and Solingen, Germany Private law contractor Upgrading the existing copper network. Conversion of 64 dividers dec.14
13. Relocation of the TC network for the construction of a parallel gas pipeline M2/1 at the section TROJANE-VODICE C & G, d.o.o. Relocation of the TC network due to the construction of a parallel pipeline dec.14
14. IMPLEMENTATION OF DIGITAL VIDEO MONITORING ON MOTORWAYS IN RS (IPK 1) TENZOR d.o.o. Building a network for video surveillance of certain locations along the motorways in RS dec.14
15. Reconstruction of the switching field and implementation of the synchronization of DEA Vojkova 78. Preparation of a system at the start-up of a virtual power plant. Telekom Slovenije, d.d. Delivery of the new switching field of the SIEMENS Sivacon modular design, which enables greater flexibility and reliability of the power supply of the facilities of Telekom Slovenije, Vojkova 78 A and B. At the same time, we supplied two new control cabinets for two Diesel Electric Aggregates, which acquired the Virtual Power Plant function. nov.14
16. eBADGE smart grid – Installation work Telekom Slovenije, d.d. Installation of eBADGE equipment in users’ electric racks. jun.14
17. Construction of the FTTH optical network in the municipality of Gangelt, Germany Private law contractor 100km of excavations and 810km of laid optical cables. Construction of 5,400 household connections jun.14
18. Supply and installation of NN distribution boxes and cable connections for connection to UPS systems 4x300kVA, Telekom Slovenije (NMT) facility, Cigaletova 10 and 17, Telekom Slovenije, d.d. Supply and installation of NN distribution boxes and cable connections for connection of UPS system 4x300kVA, Telekom Slovenije (NMT) facility, Cigaletova 10 and 17 mar.14
19. Deployment and protection of energy and optical cables for the implementation of the rehabilitation of the Karavanke tunnel end CVP-inženiring
DARS
Relocation and protection of energy and optical cables due to the repair of the flooring and the road in the Kravanke tunnel dec.13
20. Implementation of cable trails and wiring of the video surveillance system in the KARAVANKE tunnel DARS d.d. Installation of the shelf through the tunnel, construction and connection of the video surveillance network in the Karavanke Tunnel dec.13
21. OMV Cikava petrol station – Kit Electrical work and supply of TRAFO station OMV Implementation of electrical installations and supply of equipment: switching blocks, lighting, grounding, lightning protection and connection of technological equipment for the construction of a new petrol service station. Construction of a new Transformer station with a new supply cable conduit. nov.13
22. Construction of an open broadband network in the municipality of Gornja Radgona Municipality of Gornja Radgona 108km of excavations and 213km of laid optical cables. Construction of 461 household connections nov.13
23. Construction of the FTTH optical network in the settlement Ahaus, Germany Private law contractor Construction of 240 subscribers in Ahaus jun.13
24. Construction of the FTTX optical network in the village of Marburg, Germany Private law contractor Construction of 260 subscribers in the town of Marburg maj.13
25. Construction of the FTTX optical network in the town of Saarbrücken, Germany Private law contractor Construction of the FTTX network in the city center of Saarbrücken apr.13
26. Construction of an open broadband network in the municipality of Radenci Municipality of Radenci 66km of excavations and 146km of laid optical cables. Construction of 500 household connections jan.13
27. Reconstruction of electrical installations in PX Domžale Telekom Slovenije, d.d. Delivery of a new switching box of the modular version SIEMENS Sivacon, and supply of the DEA 60kVA dec.12
28. Construction of the FTTH optical network in the settlement Hochmoor, Germany Private law contractor Construction of 110 new connections to the FTTH network via the PTP system dec.12
29. Reconstruction of TP 20/0.4kV TELEKOM Stegne 19 Telekom Slovenije, d.d. Supply and installation of 2 x trafo 20/0,4kV, SN cells and NN field SIEMENS Sivacon, location TELEKOM Stegne 19 nov.12
30. Construction, operation and maintenance of an open broadband network in the municipalities of Mokronog-Trebelna, Mirna Peč, Trebnje-Mirna, Šentrupert and Žužemberk Municipality of Mokronog-Trebelno 530km of excavations and 640km of laid fiber optic cables. Construction of 3,200 household connections and 150 public users nov.12
31. Construction, operation and maintenance of an open broadband network in the municipality of Sevnica Municipality of Sevnica 430km of excavations and 510km of laid optical cables. Construction of 2,500 household connections and 150 public users nov.12
32. Construction, operation and maintenance of an open broadband network in the municipality of Slovenske Konjice Municipality of Slovenske Konjice 150km of excavations and 190km of laid optical cables. Construction of 1,100 household connections and 50 public users nov.12
33. Construction of the FTTH optical network in the settlement Ottenstein, Germany Private law contractor Construction of 230 new connections to the FTTH network via the PTP system okt.12
34. Completion of the Perutnina Ptuj solar power plant, 400kWp ERC Energetika d.o.o. Construction of a turnkey Solar Power Plant, documentation arrangement, handover to the client. sep.12
35. Construction of solar power plant UNIOR-3, 250kWp ELTEC-Petrol d.o.o. Construction of a turnkey solar power plant 250kWp, construction, documentation arrangement and 5 year maintenance. jun.12
36. Construction of SE Telekom Litostrojska, power of 49 kWp Telekom Slovenije, d.d. Construction of a turnkey Solar Power Plant, documentation arrangement, handover to the client. jun.12
37. Construction of five solar power plants at the Gorenjska Elementary School, total power of 200 kWp ELTEC-Petrol d.o.o. 5 turnkey solar power plants, construction, documentation arrangement, handover to the customer. jun.12
38. Installation and electro installation works for the reconstruction of electrical and air-conditioning systems of technological premises TELEKOM KARE Telekom Slovenije, d.d. Supply and installation of DEA 6 x 800kVA, SIEMENS Sivacon switchgear, SN transformers, … mar.12
39. Construction of Electrical Installations for BS Vipava Sever Primorje d.d. Implementation of electrical installations and supply of equipment: switching blocks, lighting, grounding, lightning protection and connection of technological equipment for the construction of a new petrol service station. dec.11
40. Construction, operation and maintenance of an open broadband network in the municipalities of Ormož, Sveti Tomaž and Središče ob Dravi Ormož, Sveti Tomaž and Središče ob Dravi 350km of excavations and 500km of laid optical cables. Construction of 2,500 household connections and 150 public users dec.10
41. Construction, operation and maintenance of an open broadband network in the Mislinja and Drava valleys Municipality of Slovenj Gradec 950km of excavations and 1,100km of laid fiber optic cables. Construction of 4,000 household connections and 200 public users sep.10